
Suez Canal
Suez Canal began operating in 1869. Construction began on April 25, 1859. The canal, which took ten years to construct, connects the Mediterranean Sea and the Red Sea. Today the canal is 120 miles long and about 80 feet deep. It has no locks. Children can find interesting facts and great photographs at: Suez Canal.
Suez Canal began construction in 1859. The 120-mile canal connecting the Mediterranean Sea and the Red Sea began operations November 17, 1869. The canal has no locks because the two seas are fairly level. Children can find interesting facts and great photographs at: